Thursday, June 3, 2010

Wednesday, June 2, 2010

Pool Progress Update


We went on vacation last week to the Smoky Mountains in East Tennessee. (A great vacation...I'll have to post pictures soon.) While we were away, the contractors started on the deck around our pool and this shows how far they got. It will be 4 feet wide around three sides and 16 X 25 on the end closest to the house, with a raised portion in the corner.


Here's another view of how things looked when we got home on Sunday.

This is the progress as of the end of the day on Wednesday, June 2. At this point, the framing is all done and they've gotten a small start on the cedar decking.


The cedar looks and smells great!


They're using an under-mount system which will allow us to have no nail or screw heads showing from the surface. It looks good and will be good on bare feet.

Monday, May 17, 2010

Finally Full!

The hose finally came out at about 6:00 tonight and the pump is up and running. Tomorrow brings the permanent electric run to the equipment and balancing water chemistry.

Sounds like construction on the deck could start as early as this Thursday!

Monday Morning

This is Monday morning. After getting marginal help from some overnight and early morning rain, we're almost to the top. Looks to me like we have about 6 inches to go, which should take about 5 - 6 hours. By then, the walls should be all the way up and we'll be ready to start filtering!

Sunday, May 16, 2010

And the process continues...

Saturday morning starts with the decision that we can go ahead and start filling...even though all the connections aren't made just yet. This was a good call...it took a long, long time for the water level to reach any of those connection points!

So, once the filling was started, it was time to get things connected. I don't install pool pump and filter assemblies every day so a close look at the instructions was in order. Several close looks to be exact.

And the finished product! (Well, the pool is still virtually empty, but the equipment is installed!)


So here it is on Sunday afternoon at about 5:00. We figured out that the water was rising at a rate of about 3/4 of an inch per hour.


And here was how it looked when we got home from church and a trip to McDonald's with friends on Sunday night. We measured the depth at 27" and the sides are not sagging in the middle anymore. Of course, all of the sides need to come up more, but it looks like it's working.



Friday, May 14, 2010


The end of the leveling process...Bunky is one picky dude! When the goal is to be level, then level it must be!


Now on to installation!


I know, it looks a bit "saggy"...and from what I understand, it will look saggy until the last couple of inches of water are in. Incidentally, we didn't finish the installation today. We were able to get the wall fittings in and the two main hoses attached as well as the salt water cell. We ran out of daylight before actually getting the pump and filter installed. We'll do that tomorrow and then the filling starts! We imagine it will take the better part of 2 days to fill...just in time for Monday when the electrical service is trenched out to the pool.

OK...the promo materials for this pool indicate that it is very easy to set up and can be done in about an hour. NOT!!! Terri and I, with the help of the girls, got the top railings in, but then the girls had to leave for much of the evening. We started in on getting the legs attached, which was pretty tough. We had a couple of legs attached, when our neighbor Elmer Veldhuizen and his son Leon (visiting from Wisconsin) lended their helping hands. Elmer's brother-in-law, Marvin, even joined us for the last few legs. The leg installation and "rising" of the pool went much better from that point on, although still tough. After fininshing that part, The Velhuizen crew went home for dinner...but then to our surprise, we heard them whooping it up, walking over in their swim trunks, ready to take a dip! It was pretty funny...and they were VERY good and welcome help!! Thanks Elmer, Leon and Marvin!
So, at this point we're a good 4 hours into our installation process, with a lot more help than is supposed to be needed. And we're not done yet! I'm hoping the rest of the connections aren't too complicated for this non-plumber, inexperienced pool guy. Time will tell...and so will this blog!



Pool Progress


Here comes the sand!



It seems that they're expecting to bring 3 truck loads of sand to the backyard...here it is going in and being compacted as they go.




It's unavoidable...especially after having several inches of rain this week. Fortunately, it's also fixable.