Sunday, May 16, 2010

And the process continues...

Saturday morning starts with the decision that we can go ahead and start filling...even though all the connections aren't made just yet. This was a good call...it took a long, long time for the water level to reach any of those connection points!

So, once the filling was started, it was time to get things connected. I don't install pool pump and filter assemblies every day so a close look at the instructions was in order. Several close looks to be exact.

And the finished product! (Well, the pool is still virtually empty, but the equipment is installed!)


So here it is on Sunday afternoon at about 5:00. We figured out that the water was rising at a rate of about 3/4 of an inch per hour.


And here was how it looked when we got home from church and a trip to McDonald's with friends on Sunday night. We measured the depth at 27" and the sides are not sagging in the middle anymore. Of course, all of the sides need to come up more, but it looks like it's working.